MCHS3.jpg
 

Mechanical Engineering

in Cardiff by the sea, CA

 

ABBOTT Engineering is a full service HVAC and Plumbing design firm serving the greater San Diego Area.

We have the capabilities to support many different types of project needs. We have a wide range of experience that includes (but not limited to):

  • HVAC - Commercial, Industrial and Public Works
  • Plumbing - Commercial, Industrial and Public Works
  • Central Plant Design
  • Building Energy Optimization
  • Humidification
  • Controls - DDC, Electromagnetic, Pneumatic
  • Owner Representation - Due Dilligence Reports, Contractor Administration
  • Engineering Reports
  • Commissioning
  • LEED

Our goal is to provide a quality product for each customer. Through dedication, commitment and hard work, ABBOTT Engineering will provide engineering services that will meet or exceed your expectations.

 

Phone

(760) 487-1396

EMAIL

labbott@abbotteng.com

Location

2145 Newcastle Ave
Cardiff by the Sea, CA 92007

Hours

M-Th 8a–5p
F       8a–12p

MCHS6.jpg

Project Portfolio

ABBOTT Engineering has been involved with many projects over the past years. During this time we have completed a number of projects that we are very proud of. The projects detailed below have all been significant milestones, either technically, size or in terms of the public good:

Military

Liberty Center North Island • Camp Pendleton Bldg 13131 • NAVFAC Sub Base B-539 ECC Media Center Addition • 32nd Street Waterfront Recreation Center • 29 Palms Lifelong Learning Center • Camp Pendleton Armory • Camp Pendleton Hospital Workstation & Morgue Hood • Camp Pendleton Hospital Chiller Replacement • Coronado P-753 Training Pool • P753 Solar Thermal Heating • P753 Solar Thermal Domestic Heating • China Lake P704V ISE Facility

Commercial

Biosite Process Cooling Loop • Biosite Bldg B Air Compressor Addition • Biosite C2046 Class 10k Cleanroom • Biosite C1010 Dry Room Addition • Biosite Warehouse Conditioning • Cowboy Star Restaurant • Urban Solace ? Encinitas • Rainbow Oaks Restaurant • Starbucks ? Downtown Hyatt • Cardinal Healthcare Data Center Upgrade • Cardinal Healthcare Care Fusion Server Room • CSUSM Parking Structure • UCSD Sterilizer Addition at Thornton • UCSD 9th Floor ICU Remodel • UCSD Dialysis Tank Replacement • UCSD Security Command Remodel • UCSD Cafeteria Security Upgrade • UCSD Medical Center Sterilizer Addition at Room 3-218 • UCSD Moore?s Cancer Center TI • UCSD Medical Library TI • UCSD Kearny Mesa Contracts TI • Tri City Hospital Sink Addition • Tri City Hospital ED Fast Track Hopper • Tri City Medical Human Resources TI • VA Loma Linda AH Replacements • NASSCO Bldg 44 Habitability TI • NASSCO Steel Blasting and Paint Facility • NASSCO Blast Cell Equipment Room Ventilation • GIA Inscription Room Addition • GIA Class 10k Clean Room • Johnson & Johnson Cooling Tower Water Treatment Upgrade • Federal Reserve Bank of Los Angeles Generator Addition • San Diego Hilton Convention Center

Energy Studies

Pfizer Central Plant Optimization • Kilroy High Bluff AMN ? Optimization • Alexandria Property 9393 Town Centre Energy Model • Alexandria General Atomics Court Energy Model • NBC Building VAV Min CFM Reduction • Alexandria Properties 3115 Merryfield Energy Study and M&V • AMN M&V Calculations • Kilroy Sabre Springs M&V • NBC Building M&V • NBC Building Pony Chiller Addition • Camp Pendleton Hospital Central Plant Study • Colliers 450 B Street Energy Star Application

Commissioning

Coronado Hangar 1456 Commissioning Agent • Irvine Company NBC Building Retrocommissioning Program • Pfizer CB-1 Retrocommissioning Program • Pfizer CB-2 Retrocommissioning Program • Pfizer CB-3 through 6 Retrocommissioning Program • SDG&E Performance Tracking Program ? Irvine Co OAP Bldg • SDG&E Performance Tracking Program ? Irvine Co NBC Bldg • SDG&E Performance Tracking Program ? Kilroy High Bluff • SDG&E Performance Tracking Program ? Kilroy CV3 Bldg

BIM

UCSD Music Building 3D Modeling • Physician?s Hospital of Murrieta • Cuyamaca College B/CIS 3D Modeling • Riverside Community College Science Building • Palomar MIB Building

Other Projects Include:

  • Copper Mountain Feasibility Study
  • Qcom Sorrento Towers Feasibility Study
  • Access Nurses
  • Samsung TI
  • Reflow Oven Exhaust
  • 1st Pacific Bank
  • Qcom Bldg AE DFS Lab
  • Aonix
  • Moss Adams TI
  • Willdan TI
  • Pacifc Corpoate Park-Controls Survey
  • Copper Mountain TI
  • Sorrento Towers TI
  • Healthsouth Surgical Center
  • Qcom Bldg AC  Accelrys
  • GIA GTL Expansion Phase II
  • Scripps - La Jolla Outpatient Imaging Center
  • Best Best Krieger
  • Qcom Bldg AMCC Preconstruction Report
  • North County Radiology
  • 5935 Cornerstone Core Modifications
  • Capri Elementary School Media Center
  • La Costa Restroom Addition
  • Paul Ecke Bldg 2 & 4 Moderization
  • 5935 Cornerstone Suite Demising Walls
  • Qcom Bldg AR AMCC TI
  • Boulder Bldg D Humidification
  • Qcom Pacifc Point Due Diligence
  • Furnance Cooling Loop Study
  • Qualcomm Building AR Phase 2
  • Qualcomm Boulder Humidifier Design
  • Qualcomm Building AQ Phase 2
  • Bedrosian Tile TI
  • Capri Elementary School Relo Classrooms
  • El Camino Creek Elementary School
  • Dot Hill Space Study "D"
  • Sea /World Candy Shop - Exhaust
  • SDG & E Switching Center Program
  • Sea World Brewmaster's Room
  • Education Service Center Study
  • Sea World Employee Trailer
  • Filanc TI
  • Casita Elem - Kitchen Cooling
  • Sea World BIP Changing Bldg
  • Quilogy TI
  • Qcom Pacifc Point Bldg WA
  • Qcom Pacific Point Bldg WB
  • Qcom Pacific Point Bldg WC
  • Qcom Pacific Point Bldg AW Lot 7
  • Sea World Medical Lift Pool
  • Qcom Bldg AT (Sorrento Tower North)
  • Qcom Bldg AT- Plumbing Design 
  • Qcom Bldg AQ Phase 3 - 
  • Sea World Pinniped Feeder Booth
  • Telegraph Medical Center
  • Sea World Freshwater Aquarium Ventilation
  • Fairfield Residential Phase 1 3rd Floor
  • CLC Bldg 3 TI
  • CLC Bldg 4 TI
  • Rockstar TI Phase 2
  • Sea World Heating Hot Water Loop Study
  • Olivenhain Pioneer Elementary 
  • GIA Photscribe Room
  • Fairfield Residential Phase 2
  • UCSD Music Building - Sheet Metal
  • UCSD Music Building - Electrical
  • DLR Santa Clara Plumbing
  • 450 B Street Proposal Review
  • Biosite Copper vs PVC Review Letter
  • Iris Group - Modern Postcard
  • Cowboy Star Restaurant
  • GIA Laser Scribe Expansion
  • Shane Co. Store #34 Shop Drawings
  • Clean Air Power Cooling Loop
  • Biosite Cooling Loop Redesign
  • 3715 6th Ave
  • SDG&E Humidity Calcs & Stamping
  • Citibank Fountain Valley & Solana Load Calcs and Stamping
  • Vertex TA/TI Audit
  • Marketing Tool for Energy Savings Projects
  • Home Depot - Oceanside
  • Clean Air Power Tenant Improvement
  • 3740 Park Avenue - ACES
  • Biosite - Rapid Prototype Lab CHW

 

  • Ranger Online TI
  • Iron Mountain
  • Mack Barclay
  • Qcom Bld O RF Shelter Expan
  • Qcom Bldg A Mech Upgrade
  • 9993 Waples St #110, 120 & 140
  • Qualcomm Due Dillignece-Prometheus Lab
  • 5580 Morehouse Due Diligence
  • Pechanga Clubhouse
  • Harmony Grove Phase 1
  • WIS International
  • Pfizer Chilled Water System
  • IR2 Offices Mechanical
  • Pechanga Rangers Station
  • IR2 Corporate Office Plumbing
  • Motorola San Diego Facility
  • Red Capital
  • 655 Broadway 8th Floor Corridor
  • Advanced Equities TI
  • Spa Chameleon
  • 450 A Street Report
  • Yunker & Scheider TI
  • Captek Softgel
  • Pfizer Prelim Chilled Water Loop
  • Greenbook
  • Kore One
  • Duckor Spradling
  • SDG& E Mission Control Grid Operations
  • Pfizer Energy Study
  • Johnson & Johnson  Office
  • 655 W Broadway Ste 850
  • 655 W Broadway Ste 860
  • Kyocera Thermotron
  • Pechange Golf Course
  • Fairfield Residence Phase 3
  • Clean Harbor
  • GIA Rotunda Display Conditioning
  • American Industrial Supply
  • 2200 Faraday Due Diligence
  • GIA Server Room
  • Qcom Bldg. L Server Room Repiping
  • Qcom Bldg O RF Shelter RH Coil Addition
  • La Jolla Village Professional Center
  • La Mesa Fire Station #13
  • Fairfield Residential Phase 4
  • Harbor Club Heating System
  • Miramonte Resort & Spa
  • CB3/CB4 Interconnecting Pipe Study
  • Biosite Thermolator Cooling Water Loop
  • Nobel Office Bldg Energy Study
  • 2200 Faraday Core Modifications
  • Pfizer- Strobic Fan Airflow Study
  • Pfizer - Preliminary Air Handler Humidity
  • Pfizer - Preliminary Heating Hot Water
  • Motorola Data Center
  • Paul Ecke Cooling
  • Plant Interconnecting Piping Design
  • 12121 Scripps Summitt Ste 100
  • 12121 Scripps Summitt Ste 130
  • 12121 Scripps Summitt Ste 140
  • 12121 Scripps Summit-First Floor Core
  • National City Playhouse Study
  • Nassco-M Lane AS Builts
  • 4th & B Street HVAC Upgrades
  • Stone Yard
  • Airway Road
  • Stamp TA/TI - Harbor Club
  • Stamp TA/TI - Metabasis
  • Clean Air Power Compressed Gas Drawings
  • Homeland Security
  • Head Trauma - Camp Pendleton
  • Stamp TA/TI - Pfizer (9 of them)
  • Recht Building
  • Liberty Center North Island
  • Stamping of Drawings
  • Arena Pharmaceuticals
  • West City Campus
  • SDGE, Hyatt, Bldg 1160, Vet Clinic
  • Centerside II TA/TI
  • DOW Bldg "A"
  • Mission City Corporate Center
  • Kaiser Bonita Shop Drawings
  • Kaiser 4 Story Heat Pump Capacity Study
  •